Home / Quality

20 checks before the doors close.

Five per product category, each with a method and a pass standard. This is not a marketing checklist — it is the sheet the inspector carries.

CategoryCheckMethodPass standard
DeskTube wall thicknessCaliper, 5 points per frame≥ 1.2 mm
WeldsVisual + tap testNo cracks, no missed welds
Coating adhesionCross-cut testNo lifting at edges
Top flatness1 m straight edgeGap ≤ 2 mm
Load50 kg, 24 hoursNo permanent deformation
ChairSeat-to-back jointTorque + visualNo play, no exposed screw
WeldsVisual + tap testNo cracks
Feet and tube capsPull testDo not come off by hand
Tilt stabilityRear leg lifted 15°Does not tip
Carton drop1 m, corner firstContents undamaged
Teacher deskFrame and topSame checks as deskSame tolerance
Drawer runners20 open-close cyclesSmooth, no binding
Lock alignment10 lock cyclesNo force needed
Adjustable feetFull travelThread undamaged
ColourAgainst RAL cardΔE ≤ 2
LockerDoor gapsFeeler gaugeEven, ≤ 2 mm
Hinges20 open-close cyclesNo sagging
Lock and keysFunction test2 keys, smooth
Shelf load30 kg per shelfNo bowing
Coating coverageVisual, inside and edgesNo bare metal

How the inspection runs

  • Pre-production.Materials and tube wall checked against the approved sample.
  • First article.Photographed and confirmed before the run continues.
  • Before loading.Full checklist plus AQL sampling; every defect photographed.
  • KD-specific.Hardware counted per model — screws, nuts, feet, adjusters. A missing bag of screws stops a classroom, so shortages are made good before loading.
  • Film-wrap-specific.Frames without cartons: film layers, foam on four corners, coated face inward, straps tight. Counted by piece, not by carton.
  • Report.Four pages: results, photos, defects, packing and loading notes.

The report can be forwarded as-is. When a school or a tender asks for proof of inspection, this is the document.

Third-party inspection

We can book SGS, BV or TÜV for a pre-loading inspection. Their fee is settled at the current rate quoted to you, including travel; we do not add a margin.

Product testing can also be arranged per order: EN 1729, load, formaldehyde release — usually two to four weeks.

Worth doing on a first order, a new factory, or when the buyer cannot be on site. It also gives you a document with a third-party logo, which helps in tenders.

The invoice comes from the inspection body, at their quoted rate.

What we will not claim

No invented pass rates

We do not publish “99.8% pass rate” figures. The checklist and the report are the evidence.

No borrowed certificates

Certificate numbers are the factory's; we list them and let you verify. EN 1729 is not held and we say so.

No hidden defects

If a batch fails a check, you hear it before loading, with photographs — not after arrival.

Want the checklist as a PDF?

Ask for the 20-point sheet and a sample inspection report.